Tan Tien 1-3 Solar Energy Project Cluster

Address: Tan Tien Commune, Bu Dop District, Binh Phuoc Province

Product: 3.75 MW rooftop solar power system

The Tan Tien 1-3 Solar Power Project, located in Tan Tien commune, Bu Dop district, Binh Phuoc province, is one of the prominent renewable energy projects, contributing to enhancing the capacity of sustainable electricity supply for the region. With a total capacity of 3.75 MW, the rooftop solar power system is deployed on the buildings within the project cluster, delivering high energy efficiency and minimizing environmental impact.

The rooftop solar power system at the Tan Tien 1-3 project is designed and constructed to maximize the roof area of the buildings in the area, providing a clean, cost-effective, and efficient electricity generation solution. The project not only supplies energy for local production activities but also significantly contributes to reducing the load on the national power grid.

With a capacity of 3.75 MW, the project helps reduce electricity costs, generates renewable energy, and contributes to promoting sustainable development in the region. The implementation of solar energy projects like the Tan Tien 1-3 Project not only helps businesses save costs but also contributes to environmental protection, laying the foundation for green, clean, and sustainable development in the future.

Sapa Soleil Hotel

Address: 15 Muong Hoa, Sa Pa town, Lao Cai province Product: 4* hotel and restaurant Sapa Soleil Hotel is one of the notable projects in the Sa Pa area, Lao Cai, offering a wonderful resort space with a 4-star standard. Located in the center, at 15 Muong Hoa, this hotel not only provides convenience for…

Loc Thinh 1-3 Solar Power Project Cluster

Location: Ap Cha La, Loc Thinh Commune, Loc Ninh District, Binh Phuoc Province Product: Design and construction of mini solar farm with capacity of 3 x 01 MW The Loc Thinh 1-3 Solar Power Project is implemented at Cha La hamlet, Loc Thinh commune, Loc Ninh district, Binh Phuoc province. This project consists of three…

Dong No 1-2 Solar Power Project Cluster

Location: Dong No Commune, Hon Quan District, Binh Phuoc Province Product: Design and construction of mini solar farm with capacity of 2 x 01 MW The Dong No 1-2 Solar Power Project is located in Dong No commune, Hon Quan district, Binh Phuoc province. The project consists of 2 mini solar farms, each with a…